City of Frankfort





Lost Password?
State Journal
Site MapContact Us
City of Frankfort
About FrankfortLiving in FrankfortCity Departments
City GovernmentVisiting FrankfortDoing Business in Frankfort
Sewer Fee Schedule PDF Print

Sewer tap fees are based on the water meter size. All checks should be made payable to the City of Frankfort. Following is the current fee schedule:

WATER METER SIZE

CAPACITY FACTOR

CAPACITY FEES

5/8"

1.00

$ 2,192.00

3/25" 

  1.50
  $ 3,013.00

1"

2.50

$ 4,655.00

1 ½"

5.00

$ 8,760.00

2"

8.00

$ 13,686.00

3" TURBINE

22.50

$ 37,495.00

4" TURBINE

50.00

$ 82,650.00

6" TURBINE

90.00

$ 148,330.00

8" TURBINE

175.00

$ 287,900.00

3" COMPOUND

16.00

$ 26,822.00

4" COMPOUND

25.00

$ 41,600.00

6" COMPOUND

80.00

$ 131,910.00

3" COMBINATION

32.50

$ 53,915.00

4" COMBINATION

57.50

$ 94,965.00

Surcharge for High Strength Waste Table

PARAMETERSCONCENTRATION LIMITSURCHARGE IN EXCESS OF LIMIT
BOD200 mg/l$  .18/lb. BOD
TSS200 mg/l$  .16/lb. TSS

Fee Table

Current fees for Sewer Extension Design Review, Written Easement Review, Video Inspection, Re-Inspection and
Re-Testing for new sewer construction.  All fees shall be paid in advance.

REVIEW/INSPECTION/TESTING

FEES

Sewer Extension Design Review

$250

Written Easement Review

$100

Final Inspection

1st Final inspection is free with follow-up

Each additional Final Inspection is $100 after follow-up

Video Inspection

1st Video inspection fee is free

2nd  Video inspection is $2 per foot

3rd   and subsequent video inspections are $2.50 per foot

Witness Testing

 

 

(Pipe tests are based upon manhole to manhole segments of pipe tested)

1st manhole test is free

1st  manhole retest - $35 each

Subsequent manhole retest - $50 each

 

1st pipe mandrel test is free

1st pipe mandrel retest - 50¢ per foot of main

Subsequent pipe mandrel main retest - $1 per foot of main

 

1st pipe pressure test is free

1st pipe pressure retest - 50¢ per foot of main

Subsequent pipe mandrel main retest - $1 per foot of main

 

1st pump station test is free

1st pump station retest - $150 each

Subsequent pump station retest - $259 each

 

Tap Inspection

1st tap inspection is free

Re-inspection - $35 each

Installation of Cleanout Vault

$550

Sewer Captial Recovery Program Application

$150

Last Updated ( Wednesday, 12 September 2007 )
 


 
City of Frankfort City of Frankfort