Sewer tap fees are based on the water meter size. All checks should be made payable to the City of Frankfort. Following is the current fee schedule: WATER METER SIZE | CAPACITY FACTOR | CAPACITY FEES | 5/8" | 1.00 | $ 2,192.00 | 3/25" | 1.50
| $ 3,013.00 | 1" | 2.50 | $ 4,655.00 | 1 ½" | 5.00 | $ 8,760.00 | 2" | 8.00 | $ 13,686.00 | 3" TURBINE | 22.50 | $ 37,495.00 | 4" TURBINE | 50.00 | $ 82,650.00 | 6" TURBINE | 90.00 | $ 148,330.00 | 8" TURBINE | 175.00 | $ 287,900.00 | 3" COMPOUND | 16.00 | $ 26,822.00 | 4" COMPOUND | 25.00 | $ 41,600.00 | 6" COMPOUND | 80.00 | $ 131,910.00 | 3" COMBINATION | 32.50 | $ 53,915.00 | 4" COMBINATION | 57.50 | $ 94,965.00 |
Surcharge for High Strength Waste Table | PARAMETERS | CONCENTRATION LIMIT | SURCHARGE IN EXCESS OF LIMIT | | BOD | 200 mg/l | $ .18/lb. BOD | | TSS | 200 mg/l | $ .16/lb. TSS |
Fee Table Current fees for Sewer Extension Design Review, Written Easement Review, Video Inspection, Re-Inspection and Re-Testing for new sewer construction. All fees shall be paid in advance. REVIEW/INSPECTION/TESTING | FEES | Sewer Extension Design Review | $250 | Written Easement Review | $100 | Final Inspection | 1st Final inspection is free with follow-up Each additional Final Inspection is $100 after follow-up | Video Inspection | 1st Video inspection fee is free 2nd Video inspection is $2 per foot 3rd and subsequent video inspections are $2.50 per foot | Witness Testing (Pipe tests are based upon manhole to manhole segments of pipe tested) | 1st manhole test is free 1st manhole retest - $35 each Subsequent manhole retest - $50 each 1st pipe mandrel test is free 1st pipe mandrel retest - 50¢ per foot of main Subsequent pipe mandrel main retest - $1 per foot of main 1st pipe pressure test is free 1st pipe pressure retest - 50¢ per foot of main Subsequent pipe mandrel main retest - $1 per foot of main 1st pump station test is free 1st pump station retest - $150 each Subsequent pump station retest - $259 each | Tap Inspection | 1st tap inspection is free Re-inspection - $35 each | Installation of Cleanout Vault | $550 | Sewer Captial Recovery Program Application | $150 |
|
|
Last Updated ( Wednesday, 12 September 2007 )
|